ERCB Approves Pipelines and Gas Well Battery in Beaver Mines Area: B93.3 FM : Lethbridge's #1 Hit Music Station : Lethbridge News, Alberta
B93 FM Lethbridge

 
Home /Local News Feed /
ERCB Approves Pipelines and Gas Well Battery in Beaver Mines Area

 
 

LETHBRIDGE: The Energy Resources Conservation Board (ERCB) has approved, with conditions, the construction and use of two pipelines and a single gas well battery in the Beaver Mines area for Shell Canada Limited.

 

The pipelines are about 1.2-kilometres long and are needed by Shell for the company's existing Waterton 68 well, which was approved by the ERCB in 2011.

 

Following a hearing in Pincher Creek in March of this year, the board noted that they were satisfied that Shell had met all conditions previously put in place for the Waterton 68 well, and that they could operate the new lines safely.

 

The conditions in place include measures such as environmental monitoring and the creation of an emergency response plan, which will then be tested by an independent third party.



Posted on Wednesday, May 29, 2013 at 4/23/2014 2:56:28 PM
Source: Patrick Burles (@PatrickBurles on Twitter)-- Country 95 News
 
 
Latest News Articles

 
Former Taber Man Gets Nine Years for Sexually Assaulting Step Sons
Wednesday, May 29, 2013 : 4/23/2014 2:56:28 PM
 
Property Taxes Get Even Lower In Village Of Nobleford
Wednesday, May 29, 2013 : 4/23/2014 2:56:28 PM
 
Lethbridge Fish and Game Association Hosting Free Event at Shooting Range this Weekend
Wednesday, May 29, 2013 : 4/23/2014 2:56:28 PM
 
Get Rid Of Old Electronics During The "Ecycle Drive"
Wednesday, May 29, 2013 : 4/23/2014 2:56:28 PM
 
Public Library Getting New Bookmobile
Wednesday, May 29, 2013 : 4/23/2014 2:56:28 PM
Home /Country 95.5 FM News


 
 

 




 
B93.3 FM
Home Promotions
Station Blogs
On Air Events
News  
Other Links
Contact Us Alberta Equity Scholarship Program
Legal Notice Advertise with B93.3 FM
Privacy Policy  
Connect with B93.3 FM